Data Centre Design Consulting — Feasibility, Tier Level & Layout
What You Get
A datacenter is a 10–15 year investment. Get the engineering right *before* pouring concrete.
✅ Feasibility study: site selection, power availability, risk & budget
✅ Target Tier definition (Tier II / III / IV per Uptime Institute / TIA-942)
✅ White-space layout: racks, hot/cold aisles, containment, growth paths
✅ Electrical design review: UPS, generators, PDU, redundancy topologies
✅ Mechanical design review: cooling, CRAC/CRAH, N+1 vs 2N
✅ BOM & vendor shortlist + RFP/tender support
✅ Construction supervision & commissioning checklists (Pro+)
✅ UAT & handover documentation
What We Need From You
📋 Site drawings (or photos/video walkthrough), power & space constraints, budget envelope, and a project decision-maker. Fully remote; on-site visits quoted separately.
Why It's Worth It
💰 Design errors at build time cost **10× more** to fix after commissioning. A small design consultancy fee routinely saves 5–15% of total build cost — and years of operational pain.
Timeline
⚙️ Feasibility: 2–3 weeks · Detailed Design: 6–8 weeks · Project Delivery: 3–6 months
What’s included
- Feasibility & site study
- Tier II–IV target design
- White-space & aisle layout
- Electrical/mechanical review
- BOM + vendor shortlists
- RFP/tender support
- Commissioning supervision